| 昆山玖德隆EPDM片擦擠出機(jī) |
![]() |
價(jià)格: 元(人民幣) | 產(chǎn)地:江蘇昆山市 |
| 最少起訂量:1套 | 發(fā)貨地:江蘇昆山市 | |
| 上架時(shí)間:2018-04-27 15:57:23 | 瀏覽量:365 | |
玖德隆機(jī)械(昆山)有限公司
![]() |
||
| 經(jīng)營模式:貿(mào)易公司 | 公司類型:私營有限責(zé)任公司 | |
| 所屬行業(yè):塑料擠出機(jī) | 主要客戶:汽車生產(chǎn)商,造粒廠 | |
在線咨詢 ![]() |
||
| 聯(lián)系人:Linda (小姐) | 手機(jī):15062681355 |
|
電話: |
傳真: |
| 郵箱:zhaoksjdl@qq.como | 地址:昆山市花橋鎮(zhèn)象蚌涇路28號(hào) |
|
三元乙丙(EPDM) ?三元乙丙橡膠是由乙烯、丙烯經(jīng)溶液共聚合而成的橡膠,再引入第三單體(ENB)。三元乙丙橡膠基本上是一種飽和的高聚物,耐老化性能非常好、耐天候性好、電絕緣性能優(yōu)良、耐化學(xué)腐蝕性好、沖擊彈性較好。 ???生產(chǎn)線流程:
1. Preparation before launch. 1.1 apply grease to the place where lubrication is needed, check the oil level, and make up the maximum and minimum of the oil level if necessary. 1.2 open the valve of the compressed air and check whether the pipe is leaking.Check the water level of the tank, add water to 2/3 of the tank volume, start the pump, and check whether the water pressure value is between 0.3-0.4Mpa. 1.3 cleaning bin and hopper, adding raw materials, raw materials should meet at least 1 hour of production. 1.4 start the cutting machine to check whether the rotation direction of the cutter is correct. 2. Start 2.1 the heating process is carried out in three stages, and the interval is about 15min between each stage.When the operating temperature is reached, it is necessary to tighten the heater connection screw again. 2.2 according to the requirements of the process, the temperature of each region shall be set. After the temperature in each region reaches the set value, the temperature shall remain constant for 50 minutes, and the temperature control meter and solenoid valve shall be checked for normal. 2.3 open the lubricating oil valve to further confirm that there is no oil leak and open the water cooler switch of the lubricating oil. 2.4 set the main engine speed, start the main motor and gradually increase under the condition of idling, keep the rotating speed of 20rpm for about 1 minute, and check whether the idle current of the main engine is stable. 2.5 low speed start feeding motor and start feeding.When the material is extruded from the head, accelerate the screw speed and gradually speed up the feeding speed to match the speed of the main engine, increasing no more than 50rpm each time. 2.6 when the equipment is stable for a certain period of time, the valve opening of the regulating cylinder is at its best. 2.7 the vacuum system is opened after stable operation of the extruder. ? ? ? |
| 版權(quán)聲明:以上所展示的信息由會(huì)員自行提供,內(nèi)容的真實(shí)性、準(zhǔn)確性和合法性由發(fā)布會(huì)員負(fù)責(zé)。機(jī)電之家對(duì)此不承擔(dān)任何責(zé)任。 友情提醒:為規(guī)避購買風(fēng)險(xiǎn),建議您在購買相關(guān)產(chǎn)品前務(wù)必確認(rèn)供應(yīng)商資質(zhì)及產(chǎn)品質(zhì)量。 |
機(jī)電之家網(wǎng) - 機(jī)電行業(yè)權(quán)威網(wǎng)絡(luò)宣傳媒體
關(guān)于我們 | 聯(lián)系我們 | 廣告合作 | 付款方式 | 使用幫助 | 會(huì)員助手 | 免費(fèi)鏈接Copyright 2026 jdzj.com All Rights Reserved??技術(shù)支持:機(jī)電之家 服務(wù)熱線:0571-87774297
網(wǎng)站經(jīng)營許可證:浙B2-20080178